New here? Get 15% off your first order Claim discount

Uncategorized

Develop a detailed resource plan for building a 600-square-foot backyard gym, building off the Week 2 Work Breakdown Structure (WBS) Assignment. This resource plan should identify the necessary human and material

By admin3 · · 2 min read

Week 5 Assignment: Resource Plan Development
Hide Assignment Information
Turnitinnl
5j This assignment will be submitted to Turnitin””.
Instructions
Assignment Directions:
Objective: Develop a detailed resource plan for building a 600-square-foot backyard gym, building off the Week 2 Work Breakdown Structure (WBS) Assignment. This resource plan should identify the necessary human and material resources, ensuring no resource is allocated more than 1 00%.
Instructions:
Human resources:
· Identify at least five key human resources needed for the project. Include the
role/team and a description of the work required from them (line items).
” Ensure no resource is allocated more than 100% of their capacity. This means careful
scheduling and allocation of work hours.
” Include the hourly rate for each human resource.
Material resou recs:
” Create a detailed list of materials required to complete the project. This includes
items such as gym equipment, construction materials, and any other necessary supplies.
” For each material resource, provide the quantity needed and the cost per unit.
Resource plan spreadsheet:
· Using the template provided, create a resource plan that details the distribution of
work hours and material usage throughout the project timeline (the project is estimated to be completed within 30 calendar days).
Cost summary:
” Summarize the overall cost of each human resource and all material resources.
Late assignments are penalized per the late policy outlined in the course syllabus. Late assignments are not accepted 7 days past the original due date.
Submission Instructions:
Grading Rubric
Review the grading rubric prior to submittal.
” Formatting:
o Document structure: Use the template provided.
· Submission: Submit your completed resource plan spreadsheet for grading via the
Excel template provided.
o Assignment Rubric Title: Week 5: Resource Plan
This Assignment aligns with the following:
” CO-3: Evaluate project management processes.
o LO-3.3: Design a resource plan that demonstrates proficiency in aligning
resources with project needs.

Related articles